NFPA 110 · Emergency & Standby Power

NFPA 110 Generator Testing.
Documented, Survey-Ready, One Platform.

When normal power fails, the emergency power supply system keeps a hospital running — and CMS and the accreditation bodies expect to see that it was tested. Fire Inspect Hub runs the NFPA 110 Chapter 8 inspection end to end: program verification, load testing, fuel quality, and transfer-switch operation, captured once and printed in a clean, defensible record.

No credit card required

The Defend-in-Place Strategy Depends on Power.

Hospitals don't evacuate during a fire — they defend in place. That strategy assumes the building keeps working: alarms, smoke control, medical equipment, and egress lighting all ride through a normal-power loss on the emergency power supply system (EPSS). If the generator doesn't start, or won't carry the load, the building has no standby power.

That's why CMS and both major accreditation bodies expect documented generator testing. NFPA 110 Chapter 8 is the recurring inspection, testing, and maintenance side of the standard — the weekly, monthly, annual, and triennial activities that prove the EPSS is ready, and the records a surveyor asks to see.

One Annual Visit. The Whole EPSS Program.

Program Verification

Weekly / Monthly Owner Program

Confirm the facility's weekly and monthly EPSS inspections and battery checks were performed and logged since the last visit — the owner runs the program, you verify it's real and documented.

Monthly Test

Monthly Operational Load Test

The under-load monthly run — at least 30 minutes — with the measured run-time and load percentage captured on the record, plus cold-start and transfer-switch operation.

Annual

Annual Load Bank & Fuel Quality

For diesels that don't meet the monthly 30% load, the annual load-bank test (50% / 75% / total minutes captured), plus the annual fuel-quality test date and result.

Transfer Equipment

Transfer Switch & Paralleling Gear

Transfer switches operated primary → alternate → primary, multiple-ATS rotation where present, and the transfer-switch maintenance program — connections, erosion, contacts.

Level 1

Triennial (36-Month) Test

For Level 1 systems, the continuous triennial test for the assigned class duration with diesel load captured — shown on the form only when the system is Level 1.

Classification

Level / Class / Type Captured

The EPSS classification — Level, Class (runtime), Type (start-time), prime mover, and battery type — recorded up front so the right tests and the right duration apply.

Hospital Generators and Commercial Portfolios.

NFPA 110 isn't only a healthcare standard. The same EPSS inspection serves commercial-property accounts with standby generators — data centers, high-rises, and any portfolio where a generator backs life-safety or critical loads.

That means a contractor running both healthcare and commercial work inspects generators the same way, in the same platform, with the same record — no second tool for the office buildings in the book.

One generator inspection. Every account that has one.

Measured Values, Printed on the Report.

The monthly run-time, the measured load percentage, the load-bank minutes, the fuel-test result, the triennial duration — Fire Inspect Hub captures the numbers the inspector reads off the gear and prints them on the per-asset NFPA 110 report alongside the pass/fail findings.

Severity follows the standard: a generator that won't cold-start or a transfer switch that won't transfer is treated as an impairment — no standby power — while load and duration shortfalls are scored as critical findings the inspector can escalate when the unit actually drops the load.

Built for Contractors Testing Emergency Power.

This is for fire protection and life-safety contractors who inspect generators and standby power systems — at hospitals and healthcare campuses, and at the commercial portfolios that run on backup power.

This is the right fit if:

Simple, Transparent Pricing.

Free
$0

No credit card. No time limit. Free plan reports are marked as samples and aren't for compliance submission. Upgrade for client-ready reports.

Start Free
Larger & Multi-Region Teams
Custom

Larger teams or multiple locations? Let's build you a quote.

Let's talk

Related Reading.

See the NFPA 110 Inspection in Action.

Book a demo and we'll walk you through a complete NFPA 110 EPSS inspection — the monthly load capture, the annual load-bank and fuel fields, and the per-asset report — before your next generator account needs it.

No credit card required